Project: Urban Develoopment Project in the Second Corridor of the Mekong River Region, Quang Ninh Province

Project: Cho Ray Vietnam - Japan Friendship Hospital Development Project

Cho Ray Vietnam - Japan Friendship Hospital Development Project

Scale: 10 floors, 1000 beds with total investment capital of up to 6,117 billion VND, of which the Japanese ODA  accounts for 28.8 billion Yen (equivalent to 5,751 billion VND).The project is built on a 10 hectare site in Le Minh Xuan Industrial Park, Binh Chanh District, Ho Chi Minh City. This is a hospital with a modern scale to meet the standards of international hospital with helicopter airport, equipped with CT scanner, MRI, DSA, Hybrid operating room.

English

Project: Lao National Sports Training Center

Project: Bim Son Cement Factory

Bim Son Cement Factory

- Total investment: 4,399 billion;
- Capacity: 3.8 million tons of cement per year
- The line is designed by IHI (Japan), providing equipment and technical services;
- Production of clinker using rotary kiln technology, high automation method; advanced equipment in Europe and Japan

English

Project: Radio Frequency Division Headquarters

Project: Licogi College of Technology

Licogi College of Technology

- Total investment: VND 336 billion divided into 2 phases: Phase 1 invested VND 160 billion and Phase 2 invested VND 176 billion
- Capital:
+ Own capital: 30%
+ Loan: 70%
- Location: In Center 4, Truc Lam Commune, Tinh Gia District, belonging to Nghi Son Economic Zone with an area of over 8 ha.
- Scale:
+ 92 classrooms, each room has 40 students.
+ 144m² classrooms, each room has 80 students.
+ Scale of training from 7,000 to 9,000 students per year.

English

Project: Dong Khoi Hotel (Grand Hotel)

Dong Khoi Hotel (Grand Hotel)

- Total investment: 328 billion
- Land area: 2,780 m2
- Total construction area: 2,627.5 m2
- Total floor area of construction - renovation: 23,890.5 m2
- The project consists of 20 floors, 2 basements for parking, 1 technical tunnel and 1 technical floor on the roof
- Total number of 233 rooms, including 170 new rooms and 63 renovated rooms

English

Project: Song Lam Cement Plant

Project: Song Thao Cement Factory

Song Thao Cement Factory

- Total investment is 1.671 billion
- Capacity of 2,500 tons of clinker per day; 1 million tons of cement per year
- Application technology: Dry production on the line, advanced equipment, the most modern today. Major equipment such as grinding machines are imported from Loesche (Germany), the world's leading manufacturer of cement equipment, in addition to equipment such as automatic control systems, bagging machines, weighing systems. supplied by other famous manufacturers of France, America, China

English

Project: Noi Bai International Airport