Project: Vinh Tuy bridge

Vinh Tuy bridge

The total length of nearly 15 km.
The river bridge is 3,690 meters long.
The main span is 990 m long, 38 m wide. This is considered the largest bridge in Vietnam today.
The bridge is constructed with cantilever technology and achieved the record of the length of the cantilever span of Vietnam.

English

Project: DAEWOO HOTEL

DAEWOO HOTEL

The hotel has 411 rooms. The Daewoo Hotel has 4 restaurants along with 2 bars.
Besides a restaurant system, bar with typical style, Daewoo also complete its services by a conference center accommodating 800 guests and 7 small conference rooms equipped with lights, projectors, internet In parallel with it is a business center to serve business needs, conferences, events of you.

English

Project: Vocational schools, housing combined VIMECO kindergarten

Vocational schools, housing combined VIMECO kindergarten

Location: Trung Hoa Ward - Cau Giay District - Hanoi
- Scale of construction:
    + To build a comprehensive system of infrastructure of the entire area of 26,197 m2, including roads, water supply and drainage systems, power stations, fire prevention and fighting, communications, trees ...
     + Building 03 towers of 25 storeys CT1, CT2, CT3 including:
§ 02 basements connected.
§ The first floor of three buildings is used as a public service area.
§ Floor 2, 3 of the CT2 used as nursery.

English

Project: SESAN 3 hydropower plant

Project: Vung Tau Petroleum Hotel

Project: Ha Bac fertilizer plant

Project: Luxury Apartment Booyoung vina

Project: Tan Son Nhat International Airport - Repair runway 25R

Tan Son Nhat International Airport - Repair runway 25R

- Signature of runway: 25R/07L
- Signature code according to supplementary agreement 14 ICAO: 4E
- Length: 3048m
- Width: 45,72m
- Roadside of runway:
07R/25L: 7,5m
07L/25R: 15m
- Specifications:
Average gradient: 0,13%; Typical cross slope: 1%
Co-ordinates: according to the co-ordinates system WGS-84
Type of Road surface, loading capacity announced by the method of ACN / PCN
Cover layer of runway surface is asphalt concrete Polymer, loading capacity announced is PCN=85/R/B/W/T

English

Project: Yen Son Park

Project: Hai Phong Thermal Power Plant

Hai Phong Thermal Power Plant

- Total investment: 9,670 billion Vietnamese dong;
- Power production: 3,6 billion kWh per year
- Capacity: 600MW
Include: 2 machine group that constructed in Tam Hung commune, Thuy Nguyen dist., Hai Phong city and use Anthracite coal from Quang Ning's coal mine, coal dust type 5 and 6
- Narrative:
The factory provides power for major triangle economic Hai Phong - Hanoi - Quang Ninh

English