Project: Ngoi Phat Hydropower Plant

Type of project: Industrial projects
Investor: Northern Electricity development and investment JSC. No.2 (NEDI2)
Location: Bat Xat Dist., Lao Cai
Service Description: Construction supervision consultancy; Preparation of Invitation for Bids and Evaluation of Bidding documents

- Total investment: 2.000 billion Vietnamese dong
- Total area: 209 ha.
- Generating capacity: 72 MW
- Number of machine group: 3
- Average output per year: 314.26 million kwh
- Energy tunnel route with a 9,137 m long, 4 m wide, consisting of four tunnels serving construction, five tunnel for water intake, pressure pipelines and two vertical shafts with 148 m deep and 109 m deep.